Sunday, May 5, 2024
spot_img

Northeast Frontier Railway’s Rangiya Division rolls out e-transmission receipts

Date:

Share post:

spot_img
spot_img

From Our Correspondent GUWAHATI: Rangiya Division of Northeast Frontier Railway (NFR) has chosen to go paperless, as far as goods business is concerned, with effect from August 1, 2019, by rolling out eT-RR (Electronic Transmission of Railway Receipt) by replacing RR. RR (Railway Receipt) is a vital document, in the entire chain of freight business of Railways. It is like an acknowledgement of receipt of goods for transportation by rail. The owner of original Railway Receipt is supposed to be the owner of the goods. In the earlier system, the printed RR once generated used to be given to rail customer who loaded the consignment (consignor) after completing loading in goods train and after paying all railway freight charges. The consignor, in turn, had to further transfer it to the consignee, who would take delivery of goods at destination, through post or courier. At the destination station, delivery of consignment was given on surrender of original RR by customer. In the earlier system, the customer used to face the problem of delay in taking delivery, whenever the goods train reaches destination earlier than the original RR. The new system of transmission of RR electronically, eliminates this problem entirely. The new system introduced is a very simple, hassle free and user-friendly system which would immensely benefit freight customers. In this system, the Railway Receipt (RR), a mandatory document, for effecting delivery of goods, is generated, transmitted and surrendered or deposited electronically. The first eT-RR of Rangia Division has been generated on 01.08.2019 from Indian Oil Siding at New Bongaigaon for goods loaded to destination NTPC plant at Unchahar in Uttar Pradesh. System of generating eT-RR has been enabled in all the 18 functioning locations of freight business on the Division. The entire process is carried through an FOIS portal (https://www.fois.indianrail.gov.in). In order to avail this facility, customers (both consignors and consignees) have to pre-register themselves at the nearest Railway Division, where they carry out their business. On doing so, each customer organisation would get a Global Customer Code. The customers can register themselves at FOIS portal after getting the Global Customer Code and can avail the facility of eT-RR. All the consignors of Rangiya Division have already registered themselves in FOIS portal to avail the facility of eT-RR. At least nine consignees have registered themselves for eT-RR and many more have approached the Division whose registration is under process and are at various stage. The eT-RR system is also very secure, because at every step from generation to transmission to surrender of RR, electronic authentication is required through user IDs, passwords and through unique system generated Freight Number Record (FNR) and One Time Passwords (OTPs). The system-generated FNR number and OTPs is sent only to registered e-mail IDs and mobile numbers of customers. It may be mentioned here that, railway has already introduced the system of placement of demand for wagons electronically (e-RD module) through FOIS portal. Along with the e-RD module, eT-RR makes freight business for customers more accessible and transparent. Moreover, the electronic transfer of RR is not only faster but also safer. Since there is no physical transfer of RR, it eliminates the problem of loss of RR in transit. Electronic Transmission of Railway Receipt (eT-RR) and (e-RD module) are definitely going to be a game changer as far as freight business of Railways is concerned as it provides a safer, faster, transparent and more convenient paperless system for all segments of freight customers apart from boosting the Digital India Initiatives.

spot_img
spot_img

Related articles

No side effect of Covid vax reported in state: Ampareen

By Our Reporter SHILLONG, May 4: Health Minister Ampareen Lyngdoh on Saturday asked people not to worry about the...

CM inspects Um Jasai, bars mining activities

WATER SCARCITY By Our Reporter SHILLONG, May 4: Amidst the water scarcity and drying up of water sources, Chief Minister...

PWD staff told to vacate complex at Barik by July 1

By Our Reporter SHILLONG, May 4: In what is an indication that the government is going ahead with its...

Shillong-Dawki road project hits hurdle

By Our Reporter SHILLONG, May 4: The ongoing four-lane work at a small stretch of the 2-3 km of...