Saturday, December 14, 2024
spot_img

Sal wood seized from construction site

Date:

Share post:

spot_img
spot_img

GUWAHATI: The Assam forest department seized more than 200 immature sal wood logs from a RCC bridge construction site at Neuldoba village under Boko constituency of Kamrup district on Thursday.

Forest department sources said an early morning operation was launched on the basis of information about immature sal wood logs, worth over Rs 10 lakh, being used at the construction site.

The Singra forest range was informed accordingly to take action and the staff of the range along with teams from Bamunigaon, Kukurmara and Nagarbera ranges reached the spot and seized the logs.

An excavator was also used to load the logs on trucks and later transport the timber to the Singra range office at Boko, sources said.

The 100-metre long under-construction bridge, where the timber was seized, falls within the 10-km road from Goroimari to Neuldoba being constructed by a Guwahati-based private firm.

spot_img
spot_img

Related articles

Cong quits NPP-led coalition in KHADC

No impact on executive committee: Pyniaid Sing Syiem By Our Reporter SHILLONG, Dec 13: In a major political development on...

No foul play in Assam drug rehab deaths, finds report

By Our Reporter SHILLONG, Dec 13: The magisterial probe into the death of two Meghalaya youths at a rehabilitation...

Facing ire, govt clears air on 60-yr land lease move

By Our Reporter SHILLONG, Dec 13: The state government on Friday cleared doubts that the recent amendment to the...

Attack on Ampareen’s car: Police looking into all angles

By Our Reporter SHILLONG, Dec 13: The state police are on the job to determine whether the attack on...