Joshimath (U’khand), Feb 13: A temporary lake formed at river Rishi Ganga has started discharging water, reducing the risk of another flash flood in the region, while rescuers on Saturday began boring a wider and deeper hole into the tunnel at the flood-ravaged Tapovan-Vishnugad hydel project in an attempt to reach the over 30 people trapped inside for nearly a week.
“The Silt Flushing Tunnel (SFT) was punctured on Friday night itself by drilling a 75mm-diameter hole into it but now it is being widened to 300 mm so that a camera and a water flushing pipe could be inserted into the tunnel where the trapped are possibly located,” General Manager of the NTPC project R P Ahirwal said.
The hole will have a depth of 12 metres, he said. Ahirwal said muck removal from the intake Adit tunnel, below which the SFT is located, has been done up to 136 metres.
Rescuers said they were still hopeful of finding survivors, notwithstanding the numerous challenges like the muck and the water from Dhauli Ganga constantly flowing into the tunnels. (PTI)