Dhubri-Phulbari Bridge project faces delay on Meghalaya side

Date:

Share post:

spot_imgspot_img

By Our Reporter

SHILLONG, Jan 8: The construction of the four-lane Dhubri-Phulbari Bridge is progressing as planned with some “minor” delays on the Meghalaya side, Cabinet Minister and Phulbari legislator Abu Taher Mondal said on Wednesday.
He did not disclose the issue(s) leading to the delay on the Meghalaya side.
Mondal said about 35 pillars of the bridge have been completed on the Assam side, where the work is progressing smoothly. “Officials have assured timely completion in the Meghalaya side unless there are any unforeseen incidents,” he added.
Despite the delay on the Meghalaya side, the bridge is targeted for completion by 2028.
The bridge, spanning the Brahmaputra River between Assam and Meghalaya, is billed as a transformative project for terrestrial communication in India’s Northeast region.
The length of the bridge is 19.3 km, which would make it the longest river bridge in the country. It will have 199 pillars supporting the massive structure.
The bridge will significantly reduce travel distances, especially between Phulbari in Meghalaya and Dhubri in Assam. It will shorten travel by more than 200 km, improving connectivity.
It is said that the bridge will facilitate better logistic support, easier transportation of goods, and enhanced economic activities. It will also serve as the western entry and exit point for the state, opening up new trade routes and boosting regional development.
Once completed, the bridge is expected to handle major traffic heading towards Guwahati, reducing congestion and improving connectivity within the region.
Mondal said the bridge is being positioned as a major game changer for the Northeast.
“Overall, the Dhubri-Phulbari Bridge is not just an infrastructural development but also a cornerstone for regional economic advancement, expected to catalyse growth and bring significant improvements in both transportation and trade in the Northeastern region,” he said.

spot_imgspot_img

Related articles

Why Discontinued Cars Still Have Buyers Lining Up

What keeps discontinued models on the radar Most people think a discontinued car becomes a liability overnight. That's only...

Fake currency bigger threat than drugs, says Badruddin Ajmal

Guwahati, July 9: AIUDF Chief and Binnakandi MLA Badruddin Ajmal on Thursday described the circulation of counterfeit currency...

Bihar: Two killed as car catches fire after collision with truck in Bodh Gaya

Patna, July 9: Two people were killed and another seriously injured in a devastating road accident in Bihar's...

Thane hospital horror: Doctor assaulted by Sena corporator quits, says ‘there is a lot of fear’

Mumbai, July 9: One of the doctors allegedly assaulted by Shiv Sena (Eknath Shinde faction) leader Ramesh Mhatre...