Damage assessment for compensation on amid protests at Baghjan

Date:

Share post:

spot_imgspot_img

GUWAHATI: A committee constituted by the Tinsukia district administration has initiated a survey to assess damage for providing compensation of those affected by the Baghjan gas well blowout and fire amid protests by residents seeking immediate reparation and resolution of their demands.

Around 7,000 people living in the area covering a radius of about 1500 metres around the affected natural gas producing oil of Oil India Limited had to be evacuated to safer places after the gas well caught fire on June 9 last and subsequently sheltered in relief camps.

It may be noted that Assam chief minister Sarbananda Sonowal, during a visit to the affected area recently, had assured to provide “maximum compensation” while Oil India Limited had given Rs 30,000 to each affected family as emergency relief.

 Production loss

“There has been a production loss of 406 MT of crude oil and 0.64 MMSCM of natural gas due to stoppages/blockades as reported on Wednesday. Operations were disrupted in 31 oil wells and five gas wells. Cumulative production loss due to bandhs and blockades since the blowout on May 27, 2020 is 6538 MT crude oil and 8.61 MMSCM of natural gas,” it said.

Well capping operations

Meanwhile, preparations for capping the affected gas well are on with a team from Mumbai-based Spa Technical Services Private Limited visiting the well site to assess the site for placing breathing air cascade system for safety of working personnel during well capping operation.

Moreover 15 Indian Army trucks loaded with materials for Bailey Bridge construction have reached Baghjan and preliminary work has started.

On the other hand, environment impact assessment by ERM India Pvt Limited, a NABET accredited consultant, is under way within the vicinity of the well including Dibru-Saikhowa National Park and Maguri-Motapung Beel.

“A TERI team is arranging equipment for monitoring of air quality and noise level while a delegation from CSIR-North East Institute of Science and Technology, Jorhat will be preparing a tremor report using seismological technique. Five seismometer stations are being installed today and a recce will be conducted for additional site under guidance of district authorities,” the statement said.

spot_imgspot_img

Related articles

Minister Scindia to lay foundation stone for Rs 2,500 crore Adani Group’s defence manufacturing plant in MP

New Delhi, July 4: Union Minister for Communications and Development of North-Eastern Region (DoNER), Jyotiraditya M. Scindia will...

PM Modi congratulates Trump, people of US on 250th Independence Day

New Delhi, July 4: Prime Minister Narendra Modi on Saturday congratulated US President Donald Trump and the people...

HM Amit Shah approves designation of 17 Pakistan-based individuals as ‘terrorists’

New Delhi, July 4: In keeping with Prime Minister Narendra Modi-led Central government's 'Zero Tolerance Policy' against terrorism,...

Assam: Fake currency racket probe deepens, accused shot during police operation

Guwahati, July 4: The investigation into an alleged fake Indian currency racket in Assam gathered pace on Saturday...