MDC takes stock of bridge work

Date:

Share post:

spot_imgspot_img

SHILLONG: The NPP MDC of Sohryngkham, Pyniaid Sing Syiem, inspected the under-construction bridge to connect Umpling (at Umbah) and Rynjah which had been partially washed away by heavy rain.
The bridge was being constructed at an estimated cost of Rs 5 crore under the Central Road Funds. The construction stopped due to heavy rain and lockdown. Syiem said that he wished to see the construction work of the bridge and thanked the officers for assuring to expedite the work.

spot_imgspot_img

Related articles

8000 medical procedures carried out by India’s HADR mission in Venezuela during ‘Operation Amistad’

New Delhi, July 10: Under the just-concluded ‘Operation Amistad,’ India’s Humanitarian Assistance and Disaster Relief (HADR) mission following...

India’s costliest street Khan Market sees rents climb 9 pc in Q1

New Delhi, July 10: Monthly rents for retail space in Delhi's upscale Khan Market rose 9 per cent...

Delhi Zoo welcomes three lion cubs in rare repeat breeding in same year

New Delhi, July 10: The Delhi Zoo has welcomed three Asiatic lion cubs in a rare feat of...

Assam: ED attaches Rs 5.54 cr assets in Jeevan Suraksha Ponzi scam

Guwahati, July 10: The Directorate of Enforcement (ED) has provisionally attached movable and immovable assets worth around Rs...