Bypass to address traffic mess in Jowai town

Date:

Share post:

spot_imgspot_img

From Our Correspondent

 JOWAI: The Public Work Department (Roads) is planning to construct the Jowai Bypass to connect National Highway 44 with the Jowai-Amlarem-Dawki Road (NH 40-E).

The probable cost of the construction work would be Rs 49.47 crore approximately out of which the Union Ministry of Road and Surface Transport has released a sanction of Rs 619.86 lakh for land compensation.

“The amount for land compensation has been handed over to the West Jaintia Hills Deputy Commissioner,” informed the Executive Engineer, PWD (Roads), NH Shillong Circle, Jowai Central Division, Sainia Kyndiah.

“The aim of this Bypass is to ease traffic congestion in Jowai and ensure uninterrupted flow of traffic,” he informed.

Presently the Jowai-Amlarem-Dawki Road caters to the economy of almost half of the district on the southern side. All agriculture products, the main source of economy of the people of the area, moves through this stretch of the highway. Coal, the mainstay of the economy of the District, is also transported through this highway as it is the shortest route to Bangladesh.

Jowai, the headquarter of West Jaintia Hills district, has been growing at an unplanned rate. In recent years rapid development has taken place in every sphere, whereas the roads have remained narrow, sources said.

Traffic congestion is the main problem of the town. The volume of traffic moving inside the town is tremendous especially when considering the population and the width of the roads. No wonder recent statistic indicates that there is an addition of two new vehicles every three days for the town and its surroundings villages, the sources said.

The market area of the town is the main economic zone of the district resulting in movement of enormous volume of traffic. Unfortunately, the NH 40-E runs straight through this path, so besides normal traffic, hundreds of coal-laden trucks also move through the market area for transporting coal to Bangladesh via Tamabil.

“We will start the work as soon as we get the sanction from the Central government,” Kyndiah informed.

spot_imgspot_img

Related articles

Ideology, not personalities, will decide Lok Sabha bypoll: Cong

SHILLONG, June 28: Congress leader Manuel Badwar stated that the upcoming Shillong Lok Sabha by-election should be viewed...

No resolution in sight as strike at NEHU Tura Campus enters 3rd week

TURA, June 28: The stalemate at the NEHU Tura campus continues as the Tura Campus Staff Welfare Association...

Contractors’ body seeks split-package tender for veterinary hospital

SHILLONG, June 28: The All Meghalaya Contractors and Suppliers’ Association (AMCSA) has urged the state government to withdraw...

Three aspirants vie for BJP ticket in West Shillong

SHILLONG, June 28: With the 2028 Assembly elections nearly two years away, the BJP faces an early organisational...