Load shedding withdrawn

Date:

spot_imgspot_img

By Our Reporter

SHILLONG: In a welcome relief for residents of the city, load shedding has been temporarily withdrawn from Thursday night.

MeECL PRO EB Kharmujai said that the water level has risen in the Myntdu-Leshka Project and power was available as a result of which load shedding was not enforced. He, however, stated that MeECL would again resort to load shedding as and when required when power is not available.

spot_imgspot_img

Related articles

BJP, 2028 election-na raken tarisoenga: Shullai

SHILLONG: Re·baenggipa bilsi 2028-ni Meghalaya Legislative Assembly election-o BJP, ge 8-10 seat-rangko chena ka·donganiko Cabinet-o gital rimnapgipa Minister...

CM, Cabinet Minister-rangna kamrangko suale on·a

SHILLONG: NPP-ni rikdilgipa Meghalaya Democratic Alliance (MDA) 2.0 Sorkarini da·o bilsi gni ata ong·ani ja·mano Cabinet Minister-rangko jujaatani...

This Horrific Murder Demands Soul Searching

Editor I write to express my horror at the death of four year old Insaphira Lyngdoh Mawnai, of Nongrah,...

Cabinet Rejig Defies Logic

The MDA-2 Government had only one lady minister and she was dropped thereby turning the present cabinet into...