Home 03-05-2023. 03-05-2023.

03-05-2023.

A portion of the old Guwahati-Shillong road is visible as the water level in the Umiam reservoir
falls to abnormally low levels following a prolonged spell of dry weather. (ST)

BRIDGE P-3
GUV P-3