NTPC’s Patratu project sees 800 MW unit complete trial run

Date:

Share post:

spot_imgspot_img

NEW DELHI, Oct 25: NTPC Ltd on Saturday said its installed capacity has increased to 84,849 MW, following the completion of trial operations of the 800 MW Unit at the Patratu project.
The company’s subsidiary, Patratu Vidyut Utpadan Nigam Ltd, has successfully completed the trial operation of Unit-1 (800 MW), NTPC said in a regulatory filing.
“Unit-1 (800 MW) of Patratu Super Thermal Power Project, stage-1 (3×800 MW) of Patratu Vidyut Utpadan Nigam Ltd has successfully completed the trial operation and consequently included in the installed capacity of the NTPC Group with effect from October 16,” the filing said. (PTI)

spot_imgspot_img

Related articles

Bomb threat at Mumbai’s Taj Hotel declared hoax after security check

Mumbai, July 12: A bomb threat targeting the iconic Taj Hotel in Mumbai triggered a security alarm, prompting...

Pune building collapse exposes gross failure of state govt, says Supriya Sule

Pune, July 12 (IANS) Nationalist Congress Party (SP) MP Supriya Sule has said that the loss of life...

Devotees should remain central focus of every decision concerning Ram Temple: Nripendra Misra

Ayodhya, July 12 : Ram Mandir Construction Committee Chairman Nripendra Misra on Sunday said devotees should remain the...

18-member panel to review ongoing survey identifying illegal, unrecognised madrasas in Bengal

Kolkata, July 12 : West Bengal Minority Affairs and Madrasah Education Department has constituted an 18-member committee to...