Saturday, November 16, 2024
spot_img

Pak opens first solar power plant

Date:

Share post:

spot_img
spot_img

ISLAMABAD: Pakistani Prime Minister Nawaz Sharif on Tuesday inaugurated the country’s first solar power plant, the latest fruit of increasingly close cooperation with China and a step towards an electoral promise to end crippling power cuts.
The solar park in Punjab province produces 100 MW of power, which will be increased to 1,000 MW by next year. The plant, owned by Punjab province and built by China’s Tebian Electric Apparatus Stock Co Ltd (TBEA), took a year to build at a cost of 190 million dollar, Pakistani government documents show.
“Since I became prime minister my one goal has been to eliminate darkness in Pakistan, and bring lights back to the country,” Sharif said in a speech. “By 2017-2018, there will be an end to load shedding,” he said, referring to a system of rolling black-outs used to ration electricity.
The country generated an average of 15,500 MW of power last year, about three-quarters of what it needs, a power ministry spokesman said. The shortfall can soar during peak summer months. Power shortages cripple industry and have led to widespread discontent. Sharif is keen to address the problem before the next election, due by 2018. The Quaid-e-Azam Solar Plant, spread over 500 acres (202 hectares) of sun-baked southern Punjab, is a link in an ambitious plan for a China-Pakistan economic corridor, unveiled by China’s President Xi Jinping last month.
The corridor, linking Pakistan’s Arabian sea port of Gwadar with western China’s Xinjiang region, includes energy and infrastructure projects worth up to 46 billion dollar. Pakistan says 37 billion dollar of Chinese investment is going into energy ventures to generate 16,400 MW of power. (PTI)
Camels and horses pranced to the beat of traditional drums as national flags fluttered over the inauguration ceremony. China’s ambassador, Sun Weidong, said the plant marked a new phase of cooperation between the neighbours. Sharif said solar plants planned across the country would produce a total of 4,260 MW of power. Solar and wind power is several times more expensive than electricity generated by hydropower. REUTERS RG SB1647

spot_img
spot_img

Related articles

NEHU VC goes on leave

Senior-most professor Nirmalendu Saha takes over as VC in-charge By Our Reporter SHILLONG, Nov 15: Senior-most professor Nirmalendu Saha on...

Students to continue hunger strike

By Our Reporter SHILLONG, Nov 15: The NEHUSU and KSU NEHU Unit have decided to continue with their indefinite...

NPP upbeat, others say close call in Gambegre

By Our Reporter SHILLONG, Nov 15: All political parties, except National People’s Party (NPP), felt the result of the...

CM inaugurates IGP traffic point

By Our Reporter SHILLONG, Nov 15: Chief Minister Conrad K Sangma on Friday inaugurated the redeveloped and beautified IGP...