Sunday, December 15, 2024
spot_img

2nd unit of Kameng HE project commissioned

Date:

Share post:

spot_img
spot_img

GUWAHATI: The second unit (150 MW) of Kameng Hydro Electric Project in Arunachal Pradesh was commissioned on Friday by the state’s Deputy Chief Minister and Power Minister, Chowna Mein.“As the Minister In-charge of Power, I’m happy to share the commissioning/commercial operation of 2nd Unit(150MW) of Kameng HEProject (600MW) by NTPC/NEEPCO from today, after the successful completed trial run operation. I dedicate it to the people of ArunachalPradesh & the Nation,” tweeted the Deputy Chief Minister.

spot_img
spot_img

Related articles

A President’s Bodyguard shows his skills at the President’s Bodyguard Parade Ground in New Delhi on Saturday

A President’s Bodyguard shows his skills at the President’s Bodyguard Parade Ground in New Delhi on Saturday. (PTI)

B’deshi drones near Sohra, Shella border raise concerns

By Our Reporter SHILLONG, Dec 14: Several Bangladeshi Bayraktar TB2 unmanned aerial vehicles (UAVs) have been detected flying close...

‘Ban’ on worship at cave: Assam group threatens to disrupt road links to M’laya

From Our Special Correspondent GUWAHATI, Dec 14: An Assam-based organisation called Kutumba Suraksha Parishad (KSP) has reiterated its threat...

Bill on simultaneous polls undemocratic: State Cong

By Our Reporter SHILLONG, Dec 14: The Opposition Congress has termed the ‘one nation one election’ (ONOE) bill to...