Sunday, December 15, 2024
spot_img

Threat to close down Lumshnong toll gate.

Date:

Share post:

spot_img
spot_img

SHILLONG: Irked at the deplorable condition of National Highway-6 constructed by National Highway of Authority of India (NHAI), the assistant Waheh Chnong of Umkiang village, Kynjaimon Amse said that NHAI should repair the bad road within 14 days period failing which they will close down the Lumshnong Toll gate.

spot_img
spot_img

Related articles

A President’s Bodyguard shows his skills at the President’s Bodyguard Parade Ground in New Delhi on Saturday

A President’s Bodyguard shows his skills at the President’s Bodyguard Parade Ground in New Delhi on Saturday. (PTI)

B’deshi drones near Sohra, Shella border raise concerns

By Our Reporter SHILLONG, Dec 14: Several Bangladeshi Bayraktar TB2 unmanned aerial vehicles (UAVs) have been detected flying close...

‘Ban’ on worship at cave: Assam group threatens to disrupt road links to M’laya

From Our Special Correspondent GUWAHATI, Dec 14: An Assam-based organisation called Kutumba Suraksha Parishad (KSP) has reiterated its threat...

Bill on simultaneous polls undemocratic: State Cong

By Our Reporter SHILLONG, Dec 14: The Opposition Congress has termed the ‘one nation one election’ (ONOE) bill to...