Controlled water release from Umiam dam begins

Date:

Share post:

spot_imgspot_img

SHILLONG, Aug 22: In response to a weather warning issued by the India Meteorological Department (IMD) on August 21, the Meghalaya Power Generation Corporation Limited (MePGCL) has initiated the controlled release of water from the Umiam Stage I Reservoir. The release began at 11:40 pm on Wednesday.
This move follows the IMD’s forecast of significant rainfall over the next seven days. The water level in the reservoir was recorded at 3216.15 feet at the start of the release.
The MePGCL has assured the public that the release is being conducted in a manner that prioritises safety and minimises any potential downstream impact.

spot_imgspot_img

Related articles

PM Modi congratulates Trump, people of US on 250th Independence Day

New Delhi, July 4: Prime Minister Narendra Modi on Saturday congratulated US President Donald Trump and the people...

HM Amit Shah approves designation of 17 Pakistan-based individuals as ‘terrorists’

New Delhi, July 4: In keeping with Prime Minister Narendra Modi-led Central government's 'Zero Tolerance Policy' against terrorism,...

Assam: Fake currency racket probe deepens, accused shot during police operation

Guwahati, July 4: The investigation into an alleged fake Indian currency racket in Assam gathered pace on Saturday...

From ITI classrooms to global chip lines, PM Modi hails Sanand’s semiconductor revolution

Sanand (Gujarat), July 4: In a powerful symbol of India’s rising technological prowess, Prime Minister Narendra Modi on...