Monday, May 19, 2025
spot_img

When ISRO’s trusted workhorse PSLV suffered a rare setback

Date:

Share post:

spot_imgspot_img

Sriharikota (Andhra Pradesh), May 18: ISRO’s most trusted and versatile launch vehicle, PSLV on Sunday suffered a rare setback when it failed to inject an earth observation satellite into the desired orbit.
Boasting of an excellent strike rate – a mere three failures in 63 launches so far, PSLV was expected to deliver yet again with ease on Sunday and it seemed to be cruising towards its mission before things went the other way.
On Sunday the mission involving the earth observation satellite EOS-09 onboard the PSLV-C61 rocket could not be accomplished following a pressure issue in the third stage of the launch vehicle, the Bengaluru-headquartered space agency said.
Known for its versatility, the Polar Satellite Launch Vehicle has been deployed by Indian Space Research Oragnisation (ISRO) for launching three types of payloads – Earth Observation, Geo-stationary and Navigation.
With the latest mission being unaccomplished, it is only the third time the 44 metre tall rocket has failed to deliver, the previous setbacks coming in September 1993 and August 2017.
The first development flight, PSLV-D1, was unsuccessful as it failed to put the remote sensing satellite (IRS-1E) into orbit.
Again in August 2017, PSLV C39 carrying the eighth satellite of the Indian Regional Navigation Satellite System (IRNSS) suffered a technical glitch and did not meet the mission objective.
The four stage PSLV rocket, measuring 44.5 metre tall and 2.8 metre in diameter, can carry payloads of up to 1,750 kg to Sun Synchronous Polar Orbit of 600 km altitude.
According to ISRO, PSLV earned its title ‘workhorse of ISRO’ for its consistency in placing various satellites in Low Earth Orbits (LEO).
Because of its ‘unmatched reliability’, ISRO said PSLV was also used to launch various satellites into the Geosynchronous and Geostationary orbits like those from the IRNSS constellation.
The third stage of PSLV is a solid rocket motor that provides the upper stages high thrust after the atmospheric phase of the launch. It is where PSLV-C61 also faced a technical glitch on Sunday.
“Today we targeted the 101st launch from Sriharikota, the PSLV-C61 EOS-09 mission. The PSLV is a four-stage vehicle and up to the second stage, the performance was normal. The third stage motor started perfectly but during the functioning of the third stage we are seeing afn observation and the mission could not be accomplished,” Indian Space Research Organisation Chairman V Narayanan said.
He said there was a fall in the chamber pressure of the motor case and the mission could not be accomplished.. (PTI)

spot_imgspot_img

Related articles

M’laya police will take 86 yrs to reduce gender gap: Report

SHILLONG, May 18: Meghalaya continues to lag behind most Indian states when it comes to gender representation in...

MDA will support artisans, weavers through welfare schemes: Conrad

SHILLONG, May 18: The MDA Government is committed to uplift rural economy by extending support to artisans and...

Probe beyond our scope: Govt on HNLC ‘funding’ by Dhar

SHILLONG, May 18: The state government on Sunday said it is not maintaining silence or showing a lack...

Activist moves President, PM for central probe

Allegation of gross financial irregularities in Lakadong Turmeric Project under MBDA SHILLONG, May 18: Alleging gross financial irregularities in...