Friday, September 5, 2025
spot_img

First phase of NUWSS begins

Date:

Share post:

spot_imgspot_img

NONGSTOIN: The Nongstoin Area Development Committee (NADC) on Friday clarified that the Nongstoin Urban Water Supply Scheme (NUWSS), worth Rs. 133.94 cr has not been scrapped and has the first phase of the scheme has begun with an amount of Rs. 30 crores.
Chairman of NADC, N. Nongdkhar, with regard to the delay in implementing the scheme, the committee has issued a pleaders’ notice to the chief engineer (PHE) and the contractor who has undertaken the construction under this scheme.
The chief engineer, PHE has also clarified that he has found ways to obtain the sanctioned amount through SCA scheme.
Tantia Construction Limited recently has moved forward to take step for the said construction.  Nongdkhar told that the Committee will continue to follow up on the matter until the construction is done, within the given amount. The foundation stone of the scheme was laid on December of 2011 during the tenure of the then PHED Minister, Shitlang Pale.

spot_imgspot_img

Related articles

POT POURRI

Big Ben restoration in running for top architecture prize London, Sep 4: The 166-year-old Big Ben clocktower in London...

World Watch

Hafiz Saeed’s outfit partners with Pak’s Punjab for flood aid LAHORE, Sep 4: Floods in Pakistan’s Punjab have left...

India defeat Malaysia 4-1 in Asia Cup hockey

India captain Harmanpreet Singh completes 250 international caps RAJGIR, (Bihar) Sep 4: A determined India produced a masterclass performance,...

Bartwal opens India’s boxing campaign with win

LIVERPOOL, Sep 4: Pawan Bartwal opened India’s campaign with a hard-fought split-decision victory over Brazil’s Michael Douglas da...