N F Railway incurs heavy loss due to disruption in operation because of flood

Date:

Share post:

spot_imgspot_img

 

Guwahati: N. F. Railway has incurred substantial losses due to damage to railway track and assets in one hand, and suspension of traffic on the other, during the unprecedented flood in Bihar and West Bengal last month with Katihar Division bearing majority of the brunt.

Approximately Rs 45 crore has been spent on repairing track and bridges in Katihar division alone, while the total cost of repairing has roughly been estimated at Rs. 63 crore. The civil engineering department had to use about 40,000 cubic meter of boulders worth about Rs. 8 crore for repair of bridges and tracks.  In Alipurduar Division, a bridge is being rebuilt between Fakiragram – Dhubri section at a cost of about Rs. 8.7 crore, the CPRO of the NF Railway P J Sharma informed.

On the commercial front the loss (estimated till 11-09-2017) is more than Rs. 209 crore with refund to passengers for cancelled train accounting for about Rs. 44 crore. A total of 1576 trips of mail /express trains and 1004 trips of passenger trains have been cancelled since first week of August 2017. Loss due to damage to other assets Signal & Telecommunication equipment etc., are still being worked out.

 

Table below shows the loss accruing to different heads:

Heads Total
(A)Revenue loss due to train cancellation Reserved segment=Rs. 78.76 crs

Non-Reserved segment=Rs. 16.12 crs

Rs. 94.88 crs
(B )Loss in ticket checking Rs. 3.88 crs
(C)Loss in Parcel segment Rs. 16.44 crs
(D)Loss in Freight segment Rs. 50.13 crs.
Total Loss (A+B+C+D) Rs. 165.33 crs
(E)Reduction in number of passengers PRS = 10,89,533, Non PRS = 30,50,278 41,39,811
(F)Refund on cancellation of trains (across counter) Rs. 43.90 crs

Various sections of N. F. Railway where flood had caused damages and their restoration dates are given below:

 

SN Section Restored on
1. Up line over Bridge No. 133 between Malda Town – New Jalpaiguri 29-08-2017
2. Up line over Bridge No. 133 between Malda Town – New Jalpaiguri 08-09-2017
3. Katihar – Kumedpur section 18-08-2017
4. Bathnaha-Jogbani section 08-09-2017
5. Eklakhi-Balurghat: (Buniadpur-Gangarampur) 24-08-2017
6. Barsoi-Radhikapur section 18-08-2017
7. Fakiragram-Dhubri section 17-08-2017
8. Alipurduar-Bamanhat section 14-08-2017
9. Senchoa-Silghat section 16-08-2017
10. Barsoi-Kumedpur section (Up Line) 25-09-17(expected)

 

 

 

 

spot_imgspot_img

Related articles

Egypt advance past group stage for 1st time at WC

egypt 1 | 1 IRAN Seattle, June 27: Egypt advanced past the group stage at the World Cup for...

Trossard’s brace powers Belgium into knockouts

Vancouver, June 27: Leandro Trossard struck twice as Belgium cruised to a commanding 5-1 victory over New Zealand...

Cabo Verde’s become smallest country to enter WC knockout

Houston, June 27: Tiny Cabo Verde defied odds to become the smallest country to earn a spot in...

Senegal rout 10-man Iraq 5-0

Toronto, June 27: Senegal needed to win and it needed to win big. Done and done. Senegal racked up...