Saturday, September 13, 2025
spot_img

MeECL Lifts Load Shedding for major part of the day

Date:

Share post:

spot_imgspot_img

Shillong, July 17: With the improvement of water level of Umiam Reservoir, the load shedding in Shillong Tura and Jowai towns has been further reduced to only 2 hours-day and for rest of the areas to 5 hours w.e.f 18 July.

It is to be mentioned that in the past few weeks MeECL has been continuously trying to reduce the load shedding and it was brought down to 5 hours from 12.07.23 and 4 hours from 15.07.23 for the urban areas.

Load shedding is being slowly lifted, keeping in mind the improvement of water level at Umiam reservoir as well as to sustain the desired water level during the coming winters and until the advent of the next monsoon.

It is also to be mentioned that at present the State is also returning the advanced banked power to the tune of about 450 million units (in total) which was utilized by the state last winter and the lean season.

spot_imgspot_img

Related articles

Salman Khan visits Ladakh Lieutenant Governor Kavinder Gupta while filming ‘Battle of Galwan’

Mumbai, Sep 13: Bollywood hunk Salman Khan visited the Lieutenant Governor of Ladakh, Kavinder Gupta, at Raj Niwas...

Indian Army demonstrates tactical excellence in exercise ‘Dibang Shakti’ in Arunachal

New Delhi, Sep 13: In a remarkable display of operational prowess, the elite troops of the Indian Army’s...

Bairabi-Sairang rail link connects Mizoram’s capital to Indian Railways network for first time: JP Nadda

New Delhi, Sep 13: Lauding the key development initiatives inaugurated by Prime Minister Narender Modi on Saturday during...

Sourav Ganguly, Harbhajan listed in Draft Electoral Rolls for upcoming BCCI elections

Mumbai, Sep 13: Former President of the Board of Control for Cricket in India (BCCI) and ex-India captain...