Total closure of Umiam bridge on March 31

Date:

Share post:

spot_imgspot_img

By Our Reporter

Shillong, March 21: The Meghalaya Energy Power Generation Corporation Limited (MePGCL) on Thursday announced restrictions on the movement of vehicles for a period of eight days, starting from March 31, at the Umiam bridge in view of the ongoing retrofitting work.
The MePGCL stated that there will be complete traffic blockage of the Umiam bridge for a minimum of six hours from 8 am to 2 pm on March 31.
“After the work is completed, only ambulances will be allowed to ply. One half of the road will be opened downstream of the bridge for vehicles upto four tons of weight during the 8 days from March 31 upto 7 am of April 8. Thereafter, vehicles upto 15 tons will be allowed downstream of the bridge,” it stated.
The deputy commissioners of East Khasi Hills and Ri-Bhoi districts have requested the PWD to examine and identify the alternative routes during the total closure of the Umiam Dam for six hours on March 31 from 8 am to 2 pm.

 

spot_imgspot_img

Related articles

A·doko JJM-ni kamrang matchotangengjok: Sorkari

SHILLONG: A·dokni nok te-5,42,527 (83.94%)-na Jal Jeevan Mission-ko a·bachengataoni chirangko sale on·aha. Meghalaya a·doko nok te 6,50,854 donga aro...

A·doko JJM-ni kamrang matchotengjok

SHILLONG: A·dokni nok te-5,42,527 (83.94%)-na Jal Jeevan Mission-ko a·bachengataoni chirangko sale on·aha. Meghalaya a·doko nok te 6,50,854 donga aro...

MBOSE academic calendar-ko nipiltaianiko skigiparang nangnika

TURA: Meghalaya Board of School Education (MBOSE)-ni academic calendar-ko a·dok sorkari nipiltaiachina Garo Hills Deficit School Teachers' and...

Assam aro Meghalaya-ni sima arirangko ta·raken nipilgen: Himanta

Jowai: Assam aro Meghalaya a·dokni sima arirangko bak dakna uamangni donchipenggipa kamrangko namgrikatna ta·raken nipilaniko dakgen, a·dok damgnini...