Respite ends, load-shedding back in M’laya

Date:

Share post:

spot_imgspot_img

SHILLONG, March 1: It lasted a mere 13 days only. The state government and the MeECL’s tall claims of being able to pay off the power dues and do away with load-shedding were busted at the stroke of midnight when power was cut in Shillong and elsewhere in Khasi Hills.
A notification doing the rounds on social media that was widely circulated on Monday night mentions a six-hour load-shedding schedule for the state.
Shillong and Khasi Hills will face powercuts from midnight till 3 am and again from 9 am till 12 noon.
Garo Hills will face powercuts from 3 am till 6 am and again from 12 noon till 3 pm.
Jaintia Hills and Ri Bhoi will face power outage from 6 am till 9 am and again from 3 pm till 6 pm.
The Byrnihat industrial area in Ri Bhoi will face powercut from 6 pm till midnight.
At the time of filing this report, there was no intimation from MeECL on the abrupt load-shedding imposed on the citizens.

spot_imgspot_img

Related articles

2028 Poll-na skang BJP, Meghalaya-o jakgittele bilakna nidingenga

Shillong: Meghalaya Assembly election-na ja 16 somoirangsan dongengon BJP, sorkario rikanio chonbegipa bakrimgipa dol ong·aoni jakgittele bilakgipa dol...

Himanta-ko Behdienkhlam-ona okamanina VPP suk ong·ja

SHILLONG: Behdienkhlam Festival-ona Assam-ni Chief Minister Himanta Biswa Sarma-ko mongsonggipa sokgipa ong·e bak ra·china okamani bidingo Voice of...

Meghalaya-o rong·mesak bikota dongja: CM

SHILLONG: A·doko rong·mesok bikotani kamrang dongja, beben sorkari, proposal-rangkode man·soachim indiba sorkari, rong·mesakko bikotani kamrangko ka·na jechakaha ine...

Dobu-ni NGO-rang RMSA School-ko HS level-ona ra·dochina dabia

TURA: East Garo Hills Dobu-ni nangrimgimin NGO dolrang- AHAM, ADIL aro GSU aro gipinrang RMSA-ni ning·o ong·gipa Dobu...