From Our Correspondent
TURA, May 17: The Executive Engineer, Ganol Civil Division-I, Tura Rongkhon, has informed that in view of the heavy rainfall, the sluice radial gates of the Ganol Small Hydroelectric Project (SHP) concrete dam may need to be opened at any time to release the water for the safety of the aforesaid dam and its structures.
In this connection, all the villagers residing or working in the downstream area of the Ganol SHP dam have been cautioned against engaging in any activities near the banks of the Ganol River as the level of the river may suddenly rise due to opening of the gates of the dam.
“However, all efforts will be made to regulate the discharge of water through the gates to the maximum,” the notification added.